Selected Photos
Low Energy Neutrino Physics
Kuo-Sheng Nuclear Power Station
:
Kuo Sheng Plant
(Low Reso.) : 1-2-3
Kuo Sheng Plant
(High Reso.) :
1
- 2
- 3
Front Gate : 1
Core : 1
Control Room :
1
Water Exhaust :1
Outage Core
#1 (Sept 2001)
:
1
CsI(Tl) Detector :
Crystal Module
: 1-2
Inner Target Mechanics
:
V.1 : 1-
2
V.2 : 1-
2
Detector Assembly
:
14-channel system : 1-2
46-channel system at KS Site (June01) : 1-2-3
180+-channel system at KS Site (Oct02) : 1-2-3-4
PMT Mount
: 1
HV System
: 1
Connector
Panel : 1
ULB-HPGe Detector :
Detector : 1
Inside Shielding @ AS : 1
Ring Detector : 1
Well Detector (with Venktesh Singh) : 1
Installing Process : 1
; 2
Installation completed at KS Site : 1
Liquid Nitrogen Refill : 1
ULE-ULB-HPGe Prototyp Detector:
Electronics & Computing:
Assembly : 1
Flash ADC Module
: 1-2
600
Gbyte Disk Array :
1
- 2
FADC Upgrade for
SPring8/LEPS :
Software :
DAQ
User Interface :
Slow
Control Interface :
Event Display
:
Shieldings :
Dec 99 :
Apr 00 : 1-2-3-4
June 00 Installation
On-Site:
1
July 00:
Sept 00:
1-2
Kuo-Sheng Neutrino Laboratory:
Virtual
Reality Picture of Site
Nov 00:
On-Site : 1-2
HP-Ge Detector : 1-2
Veto Scintillator : 1
Jan 01 :
Front Door : 1-2
Control Room : 1-2
Top View : 1-2
May 01 :
Front Door : 1-2
Front View : 1-2
Gas System : 1-2
June 01 :
Cabling at Front Door : 1
Front View : 1
Top View : 1
Jan 03 :
Front View with Door Opened : 1
Cabling and Connector Panel
:
1
Oct 03 : Complete
View :
1
Sonoluminescence Project:
※
Set-Up :
1 -
2 -
3
※
※
Collaborators:
**
Zhuang Bao-An + Teng Ping-Kung
**
Li Hau-Bin
**
Luo Ching-Shan
**
Lin Shin-Ted
**
Venktesh Singh
**
(back from Left : Lin Shin-Ted, Wong Tsz-king, Liu Da-Zhi;
from from Left : Lee Hau-Bin, Lee Feng-Shieuh, Xin Biao)
Vistors:
**
Petr Vogel (Nov 00)
**
Greg Sullivan (May01)
**
Francois Vannucci (Aug01)
**
Kim Sun-Kee (Sept01)
**
Kim Hong-Joo (Sept01)
**
Wang Ming-Zu (Sept01)
[ Visitors in principle not allowed on site
after September 2001 ]
**
Bob Hsiung (Jan 03)
** Alan Poon (Dec 03)
Archive (not-yet-organized):